Sub floor preparation, ready to install Karndean flooring. The product needs to be installed on a perfect sub floor.

A large Karndean Van-Gogh job finished today, required double screed as the sub floor had ceramic tiles removed leaving the floor very uneven, looks amazing.
16th August 2018
Karndean Van Gogh project finished today, underfloor heating system, screed with high temperature adhesive.
23rd August 2018

Sub floor preparation, ready to install Karndean flooring. The product needs to be installed on a perfect sub floor.

Leave a Reply

Your email address will not be published. Required fields are marked *